Immediate attention open Critical work orders — OMM requires action in hours, not days
WO #
Observed
Standard
Finding
Location
Priority
Due
WO #
Status
Priority
Standard
Finding
Location
Division
Assigned to
Due
Map open work orders with GPS · click a marker to open it
Corridor strip open work orders by km along each route
Open by division & category OMM series · click a number to see the work orders
By standard open work orders
By division & priority
By status every work order, not just the open ones — click a row to see them
Throughput closure performance
Work order
Read-only — admin access is required to edit, comment on, or close work orders.
What the categories mean
Priorities, OMM series, and statuses — as defined by the OMM standards
Critical
Hours, not days. Immediate safety risk to the public or a structure — report/remove immediately, or fix within 2–48 hours (potholes, debris on the driving surface, flooding on pavement, unsafe bridge railings, hazardous expansion joints). These appear in the Immediate tab.
High
Days. Correct within roughly 2–10 working days of discovery (guiderail defects affecting safe operation, multiple damaged posts, signage defects).
Medium
This season. Repair by a fixed date in the year of discovery — typically September 30 or October 31 (single guiderail defects, shoulder edge breaking, slope erosion).
Low
Cyclical. Recurring programs on multi-year cycles (e.g. crack sealing every 4 years). The deadline is the current cycle's date.
Unset
Needs a human call. The rule is "as soon as practical" or requires a Professional Engineer's assessment first — priority and date are set at review.
100
Pavement — potholes, surface defects
200
Shoulders — paved & gravel shoulder maintenance
300
Drainage — ditches, culverts, catch basins, beaver control
Reviewed — priority, date and owner set; in a division's queue.
In progress
Crew is actively working it.
Monitor
Being watched rather than repaired (legacy DMT vocabulary).
On hold
Paused — seasonal constraint, materials, or engineering input.
Resolved
Work completed — the assigned crew has done the work; the area manager checks it and closes it (or sends it back). Still counted as open, never as overdue.
Closed
Signed off with Verified by; the close date records when the work was done.
Verified
Completion checked in the field.
Cancelled
Withdrawn — duplicate or not an actionable deficiency.
Issue Non-Conformance
Raise an internal NC from this work order
Email work order
Choose who to send it to
Assign people
Send back to the crew
It goes back to In progress and the assigned people are emailed your note.
New deficiency
Logged through the same intake as Device Magic — deadline and priority are set from the OMM catalog; the division is filled in from the km or your location, and you can change it